How to Plan a Metal Roof Retrofit


How to Plan a Metal Roof Retrofit

A retrofit is different from a straightforward re-roof. Instead of stripping the building back and starting fresh, a metal retrofit adds a new steel roof system to an existing building, often over the old roof, and sometimes with new framing to change how the roof sheds water. Done well, it can avoid a messy tear-off and solve problems the old roof never could. Done without a plan, it can hide problems under a new surface.

This article assumes you already know your building is a reasonable retrofit candidate. It focuses on how to plan the project once that question has been answered.

Set clear goals for the retrofit

Owners take on retrofits for different reasons, and each goal leads to different design choices:

  • Stopping chronic leaks on an aging low-slope or built-up roof
  • Adding slope so a flat or nearly flat roof drains better
  • Improving energy performance by adding insulation or a ventilated air space
  • Changing appearance, for example on a home or storefront
  • Avoiding disposal of the existing roofing where that is appropriate

Rank them. If energy performance is near the top, insulation and ventilation decisions become central. If drainage is the priority, the framing layout matters most.

Understand the main retrofit methods

The Metal Construction Association's white paper on retrofitting existing roofing with metal describes three common approaches:

  1. Direct-to-deck: New metal panels go directly over the existing roofing, with suitable preparation and underlayment.
  2. Over-purlin: Horizontal wood or metal purlins are fastened over the existing roof, and the new panels are attached to them.
  3. Above-sheathing ventilation: The installation creates a ventilated air space between the old roof and the new metal, which is commonly used as an energy-saving strategy.

On low-slope commercial buildings, retrofit framing is sometimes used to build new slope above an existing flat roof. That changes the roof's structure and appearance, so it needs design input and likely municipal approval.

Plan for moisture and insulation from the start

Moisture is one of the most important retrofit design issues. Guidance from the Metal Building Manufacturers Association explains that condensation forms when warm, moist air meets a cold surface, and that it can damage insulation and corrode metal components. Its condensation fact sheet notes that in a retrofit, added insulation should generally sit at the existing roof level rather than against the new metal, with an adequately ventilated space above, because trapped warm air can condense on the cold metal roof.

For an Alberta building, ask your designer or contractor:

  • Where will insulation be added, if any?
  • How will the space between old and new roofs be ventilated?
  • Is there a vapour retarder, and where?
  • What does the building's interior use add in moisture?

Map every edge and penetration

Retrofits succeed or fail at the details. Before ordering material, list:

  • Rooftop equipment, curbs and vents that must be extended or reflashed
  • Parapets and walls where the new roof meets vertical surfaces
  • Gutters, scuppers and downspouts that may need to move if the roof edge changes
  • Skylights and hatches
  • Electrical, gas or plumbing lines that pass through the roof

Some of these items need other trades. Electrical, gas and plumbing work in Alberta generally needs its own permits, separate from any building permit question.

Check approvals and structure together

Adding a new roof over an old one adds weight. Adding framing to create slope can change how snow and wind act on the building. In Alberta, structural loads are governed by the National Building Code – 2023 Alberta Edition. A structural review is often part of a retrofit plan, especially on larger or older buildings.

For permits, re-roofing with a similar material is generally exempt under Alberta's Permit Regulation, but a retrofit that changes structure or adds framing may not be. Confirm with your municipality before the design is final.

Budget for the unknowns

Even a careful assessment cannot see everything. A practical retrofit budget includes:

  • A contingency for repairs found once work begins
  • Clear unit prices for added work, such as extra framing or deck repair
  • Time for other trades to relocate equipment or lines

Sequence the work with the building's use

Retrofits often happen on occupied buildings. Plan which areas will be affected each day, how deliveries and staff or family movements will work and how the roof will be protected if work stops mid-section. When you compare metal roofing services edmonton contractors offer for retrofits, ask how they phase work on an occupied building and how they keep partly finished sections watertight overnight.

Keep a record

Ask for documentation of the method used, the products, insulation and ventilation details and any structural input. Anyone working on the building in the future will need to know what is under the new roof.